Completed Projects

Dokmardi Silvasa - Dadra & Nagar Havelli (Decorative Lighting)

Dokmardi, Silvassa – Dadra & Nagar Haveli. Silvassa Flyover Bridge, Khanvel-Silvassa Road, near HR House and Govt. Civil Court, Silvassa.

Mancherial - Repallewada

Four Laning of NH-363 from Mancherial (Design KM.0.000/Existing KM. 251.900) To Repallewada (Design KM. 42.000/Existing KM. 288.510) (Design Length 42.000 KM) in the state of Telangana under NHDP Phase-IV under NH (O) on Hybrid Annuity Mode.

Udaipur–Shamlaji NH-8 Six-Laning (DBFOT)

Six-laning of Udaipur (Km 287.400) to Shamlaji (Km 401.200) section of NH-8 in the states of Rajasthan and Gujarat (Length: 113.800 km) on DBFOT (Toll) under NHDP Phase V, Package-V.

Delhi–Agra NH-2 Six-Laning – NHDP Phase V (BOT Toll)

Six-laning of Delhi–Agra section of National Highway No. 2 in the states of Haryana and Uttar Pradesh, from Km 20.500 to Km 200.000, under NHDP Phase V as BOT (Toll).

Pune–Satara NH-4 Six-Laning – BOT (Toll)

Six-laning of Pune–Satara section of National Highway No. 4 from Km 725.000 to Km 865.350 (Length: 140.35 km) in the state of Maharashtra on BOT (Toll) basis.

Nagpur–Mumbai Expressway (Pkg-14) – Cable Tray Installation (EPC Mode)

Construction of the access-controlled Nagpur–Mumbai Super Communication Expressway (Maharashtra Samruddhi Mahamarg) in the state of Maharashtra on EPC mode, under Construction Package-14 – Service order for installation of cable tray and its support system.